الرئيسية
الأبحاث العلمية
التدريس
التدرج الوظيفى
السيرة الذاتية
البحث الأكاديمى
إتصل بنا
الموقع الجديد
المجالات البحثية
A Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt
Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model
Cost analysis of continuous flight auger piles construction in Egypt
Development of a Safety Performance Index for Construction Projects in Egypt
Management of construction cost contingency covering upside and downside risks
Maximizing the economic value of irrigation water and achieving self sufficiency of main crops
Optimum Organizational Structure for Construction Projects (Management Tool of Selecting Organization in Egyptian Construction Market)
الابحاث العلمية
1 -
Cost analysis of continuous flight auger piles construction in Egypt (2016).
2 -
Development of a Safety Performance Index for Construction Projects in Egypt (2015).
3 -
Reducing Construction Disputes through Effective Claims Management (2014).
4 -
Maximizing the economic value of irrigation water and achieving self sufficiency of main crops (2014).
5 -
Management of construction cost contingency covering upside and downside risks (2014).
6 -
Risk Factors in Construction Projects Cash-Flow Analysis (2014).
7 -
Optimum Organizational Structure for Construction Projects (Management Tool of Selecting Organization in Egyptian Construction Market) (2013).
8 -
Analysis of Time and Cost Overruns in Educational Building Projects in Egypt. (2013).
9 -
Forecasting Project Schedule Performance Using Probabilistic and Deterministic Models (2013).
10 -
Effect of Re- Organization on the Performance of the Egyptian Economical Organization for Water and Waste water. (2013).
11 -
Assessment of the Expected Construction Company Net Profit Using Neural Network and Multiple Regression Models. (2013).
12 -
Assessment of Construction Company Working Capital Using Neural Network and Multiple Regression Models (2013).
13 -
Optimum Organization Structure for Construction Projects (Management Tool for Selecting Organization in the Egyptian Construction Market) (2013).
14 -
Evaluation of Change Management Efficiency of Construction Contractors (2013).
15 -
Construction Claims Causes and Management Efficiency (2013).
16 -
Assessment of Construction Materials Wastage Using Artificial Neural Network Model. (2012).
17 -
Assessment of the Expected Cost of Quality (COQ) in Construction Projects in Egypt Using Artificial Neural Network Model. (2012).
18 -
Impact of Payment Delays on Contractors Performance in Egypt. (2012).
19 -
(Effect of Inadequate Site Investigation on the Cost of Road Construction (Case Study (2012).
20 -
Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model (2012).
21 -
Neural Network and Multiple Regression Models for Estimation of Production Rates in Excavation Operations. (2012).
22 -
Modelling Excavation Operation in Building Projects - A Simulation Approach. (2012).
23 -
A Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt (2011).
24 -
Selecting of A Suitable Contract Strategy for Construction Projects Using Artificial Neural Network Model. (2011).
25 -
Time Contingency Assessment in Construction Projects in Egypt Using Artificial Neural Networks Model (2011).
26 -
SELECTING A SUITABLE CONTRACT STRATEGY FOR CONSTRUCTION PROJECTS USING ARTIFICIAL NEURAL NETWORK MODEL (2011).
27 -
A Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt. (2011).
28 -
Using Neural Networks to Assign the Maximum Capital Due Date for Construction Projects. (2010).
29 -
The neural network model for predicting the financing cost for construction projects (2009).
30 -
The neural network model for predicting the financing cost for construction projects (2009).
31 -
The neural network model for predicting the financing cost for construction projects (2009).
32 -
The Neural Network Model for Predicting the Financing Cost for Construction Projects. (2009).
تسجيل الدخول
دخول
2014 all rights reserved.
Zagazig University
جامعة المنصورة
جامعة الاسكندرية
جامعة القاهرة
جامعة سوهاج
جامعة الفيوم
جامعة بنها
جامعة دمياط
جامعة بورسعيد
جامعة حلوان
جامعة السويس
جامعة المنيا
جامعة دمنهور
جامعة المنوفية
جامعة أسوان
جامعة جنوب الوادى
جامعة قناة السويس
جامعة عين شمس
جامعة أسيوط
شراقوة | الشرقية بين ايديك
اخبار الشرقية - شراقوة | الشرقية بين ايديك
جامعة كفر الشيخ
جامعة السادات
جامعة طنطا
جامعة بنى سويف